How often should material handling equipment be serviced?
Daily pre-use inspections covering tires, hydraulics, attachments, and safety features should be done every shift, while more thorough servicing of engine, transmission, and hydraulic systems follows manufacturer-recommended running-hour intervals. UAE dust and heat conditions often require more frequent filter and cooling system checks than temperate-climate schedules assume. Any defect found during daily inspection should take the machine out of service until repaired. Sparkline Group offers scheduled maintenance for its rental fleet to keep equipment safe and reliable throughout a project.