What should be checked before mobilising a fireproofing machine to a shutdown site?

Before mobilisation, confirm the machine can handle the specific refractory grade specified, that air compressor capacity matches the machine's requirements, and that hose lengths suit the furnace or vessel geometry involved. It is also worth confirming any hazardous area or intrinsic safety requirements with the facility's HSE team given the industrial environments this equipment often operates in. Getting this right before a shutdown begins avoids costly delays once the work window has opened. Sparkline Group provides setup and compliance guidance ahead of major turnaround projects.