What should I have ready on site before the pump arrives?
Clear access for the pump truck, a stable and level working area, confirmed concrete delivery timing, and any required permits should all be in place beforehand. Poor site preparation is one of the most common causes of wasted billed hours. Sparkline Group's team can advise on site readiness requirements specific to your pump type. Preparing properly reduces the risk of standby charges eating into your budget. A quick pre-pour site check is always worth the time investment.