Screw pump for spraying or pumping conventional mortar and premixed plasters, fibre-reinforced and refractory mortars, grouting, fireproof materials, self-levelling screeds and for reinforcing injections at controlled pressure. Optional planetary mixer.
Concrete mixers are used for on-site batching of concrete and mortar on small-to-medium pours, mixing screed and render on renovation and finishing works, and producing concrete on remote sites where ready-mix delivery is impractical. They give site crews direct control over batch size and timing, independent of ready-mix truck scheduling.
From villa construction to renovation and finishing works, contractors across the UAE turn to Sparkline Group for concrete mixer sales, servicing and rental, with genuine spare parts and after-sales support available across Abu Dhabi, Dubai and the GCC.
Key Features
Hopper capacity: 120 l
Flow rate: 17/35 l/min
Motor power: 3.6 kW (1 speed) / 4.8 kW (2 speeds)
Weight: 280/404 kg
FAQs
What is the STEP 120 THREE-PHASE used for? The STEP 120 THREE-PHASE is used by contractors, precast producers and industrial teams across the UAE as part of the Concrete Mixers equipment category, supporting day-to-day site operations from small refurbishment jobs to large infrastructure and industrial projects.
What are the key specifications of the STEP 120 THREE-PHASE? The STEP 120 THREE-PHASE is built and specified for reliable output under real UAE site conditions — matching capacity, power and duty-cycle to the job is what determines whether it keeps a schedule on track. Sparkline Group's team can talk through the exact specification sheet and confirm it's the right fit for your project before you commit.
Why does choosing the right STEP 120 THREE-PHASE matter on a UAE project? An under-specified or poorly maintained step 120 three-phase slows a schedule down and is a common cause of on-site incidents, while a correctly specified, well-maintained unit keeps output consistent and meets the safety and quality standards expected on Abu Dhabi and Dubai construction and industrial sites.
How do I get pricing for the STEP 120 THREE-PHASE? Pricing for the STEP 120 THREE-PHASE depends on the exact specification and quantity required — submit a quote request through the enquiry form on this page or contact Sparkline Group directly, and our sales team will respond with a formal quotation.
Is the STEP 120 THREE-PHASE available for delivery across the UAE and GCC? Yes — Sparkline Group supplies and delivers the STEP 120 THREE-PHASE to project sites across Abu Dhabi, Dubai, Sharjah and the wider UAE, with support for GCC-wide delivery on request.